From the beginning of any construction project, the entrepreneurs, the contractors, the purchasers, and the banks that finance the project are anxious for one thing, to submit the apartments to the tenants. The declaration that the project was completed, the submission the keys to the tenants, and the occupation of the building will be done after a form no. 4 and the completion certificate are received.
As the construction stages progress, you need to provide many confirmations from competent laboratories, from architects, from measurers and from the contractors who inspected the building throughout all the construction stages in order that they may finally qualify the designated building for accommodation.
Before receiving the completion certificate, you will have to complete a long to-do list with about 60 items in order to receive a form no. 4, which is a form that confirms that the building can be connected to the electricity, water and communication systems,
When you get a form no. 4 you will oblige to the municipality that you will get a completion certificate (or in its more familiar name- form no. 5) within a year.
Occupying a building without a confirmation is a construction violation and a criminal offense!!!.
Handling the issuance of a completion certificate professionally will allow you to enjoy a quick and efficient process, which will exempt you from all the exhausting bureaucracy and forms.
We will be happy to assist you in whatever is required – till you will receive the completion certificate, which will allow your purchasers to enter the new apartment. The receipt of a form no. 5, a completion certificate, is the official confirmation that the building can be safely habited and that all the construction work was completed.
What is important to know about a form no. 5- a completion certificate
- The occupation form is evidence that there are no safety defects in the building.
- The condition for issuing this form- an approval of a form no. 4, which has the original signatures of the engineer and chairman of the local committee
- You need to get the completion certificate within a year from the issuance of a form no. 4
- This is the last confirmation before the occupation
- The local committee is responsible for issuing this form.
- The form must contain the original signatures of the engineer and chairman of the local committee.
Form no. 5- a moment before the tenants enter the building
It is important to emphasize that a completion certificate isn’t relevant only to the tenants but also to you as entrepreneurs and contractors.
The key to the apartment is given only after the construction work was completed and only after the building was connected to all its vital infrastructures. A completion certificate is your green light that all the last “touches” were done in the apartment (and in the entire building), that the apartments were connected to the electricity, gas and communication systems, and that the water corporation connected the water meters.
At which stage in the project do you start working on getting a completion certificate?
Before receiving a form no. 5 you need to get a form no. 4, which is a form that you can connect the building to permanent electricity, to water meters and to communication systems. It must be mentioned that a professional office in this filed will take care of simultaneously signing part of the officials who need to sign a form no. 4 also on a completion certificate, a form no. 5, and that way it will save you a lot of time with the red tape.
It is also important to emphasize that you need to get a form no. 5 no later than a year from the date you received a form no. 4.
A completion certificate is the final stamp of approval in this chain and it clearly and conclusively reflects that the project was successfully completed, and now the tenants can enjoy a perfectly constructed building and apartment.
Fully handling a form no. 5- a Completion Certificate
The process of issuing this certificate isn’t a short one; however, with the help of a professional assistance it can be shortened.
This is a confirmation that is based on approvals from various parties and on reports and inspections.
It is important to emphasize that absence of a completion certificate or the absence of a signature on it can delay you and cause a postponement. When the completion certificate is delayed you need to postpone the submission of the keys your purchasers, which might adversely affect their overall satisfaction, and it might adversely affect you financially because you are bound by a contract to pay penalty fines for a delay in the submission of the apartment.
Why to Choose Us?
The office of “Gil Klinger Project Initiation” has a credibility mark from Dun & Bradstreet and it specializes in the process of submitting applications for a building permit and in the issuance of form no. 4 and completion certificates.
Our office has 20 years of experience in this field, in which it got hundreds of completion certificates, got acquainted with the planning institutions and with the relevant licensing officials, and became familiar of all their requirements. Our office also profoundly learned of all the parameters that surround this complicated process, and this gives you and us a significant advantage so we will be able to assist you in whatever is required.
Our office works in full transparency throughout all the stages of the process, as well as discretely and with an orientation towards maximumly shortening the timetables while providing a top-rate service to our clients.
You mustn’t try it by yourselves!!!.
For additional details and scheduling a personal meeting you can contact us even today. +972-52-3339566